Assessment Year | 1992 |
---|---|
Principal Product | FINANCIAL PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 125 |
Plant Area |
n/a
|
Annual Production | 2,050
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $212,581 | 2,829,426 |
kWh
|
$0.075 |
Natural Gas | $21,950 | 4,318 |
MMBtu
|
$5.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,294 | $24 |
$2,564
33,998
kWh
|
- | $(-270.0) | |
02 | 2.6232: Install set-back timers | $1,243 | $200 |
$1,243
22,274
kWh
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,150 | - |
$1,150
15,240
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $2,130 | $200 | - |
$2,130
-
MMBtu
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,093 | $700 | - |
$2,093
-
MMBtu
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $1,121 | - |
$1,121
14,947
kWh
|
- | - | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $841 | - |
$841
10,844
kWh
|
- | - | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $640 | - |
$640
-
kWh
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $486 | $500 | - |
$486
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,289 | $19,976 |
$8,289
110,199
kWh
|
- | - | |
TOTAL RECOMMENDED | $20,287 | $21,600 |
$15,848
207,502
kWh
|
$4,709
-
MMBtu
|
$(-270.0) | ||
TOTAL IMPLEMENTED | $15,886 | $21,400 |
$13,577
177,315
kWh
|
$2,579
-
MMBtu
|
$(-270.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs