Assessment Year | 1991 |
---|---|
Principal Product | STATIONERY/TABLET PAPER |
NAICS |
n/a
|
SIC | 2678: Stationery, Tablets, and Related Products |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 80,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,905 | 3,227,140 |
kWh
|
$0.049 |
Natural Gas | $69,360 | 15,633 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1123: Install automatic stack damper | $3,952 | $5,600 | - |
$3,952
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,522 | - |
$2,722
-
kWh
|
- | $(-200.0) | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,859 | - |
$2,159
-
kWh
|
- | $(-300.0) | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,215 | $1,280 |
$1,215
24,619
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $770 | $238 |
$770
15,826
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $767 | $600 | - |
$767
-
MMBtu
|
- | |
07 | 2.6232: Install set-back timers | $433 | $200 |
$433
8,792
kWh
|
- | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $331 | - |
$331
6,741
kWh
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $70 | - |
$70
1,465
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,919 | $7,918 |
$7,700
57,443
kWh
|
$4,719
-
MMBtu
|
$(-500.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs