ITAC Assessment: WI0129
ITAC logo
ITAC Assessment: WI0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STATIONERY/TABLET PAPER
NAICS
n/a
SIC 2678: Stationery, Tablets, and Related Products
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 80,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,905 3,227,140
kWh
Natural Gas $69,360 15,633
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1123: Install automatic stack damper $3,952 $5,600 - $3,952
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,522 - $2,722
-
kWh
- $(-200.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,859 - $2,159
-
kWh
- $(-300.0)
04 2.4221: Install compressor air intakes in coolest locations $1,215 $1,280 $1,215
24,619
kWh
- -
05 2.2511: Insulate bare equipment $770 $238 $770
15,826
kWh
- -
06 2.7261: Install timers and/or thermostats $767 $600 - $767
-
MMBtu
-
07 2.6232: Install set-back timers $433 $200 $433
8,792
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $331 - $331
6,741
kWh
- -
09 2.6212: Turn off equipment during breaks, reduce operating time $70 - $70
1,465
kWh
- -
TOTAL RECOMMENDED $11,919 $7,918 $7,700
57,443
kWh
$4,719
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs