Assessment Year | 1995 |
---|---|
Principal Product | Inorganic chemicals |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
65,000
ft2
|
Annual Production | 55,000,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $993,038 | 22,807,152 |
kWh
|
$0.044 |
Natural Gas | $1,863,259 | 755,211 |
MMBtu
|
$2.47 |
LPG | $115,311 | 24,279 |
MMBtu
|
$4.75 |
Fuel Oil #2 | $6,504 | 1,034 |
MMBtu
|
$6.29 |
Fuel Oil #6 | $128,231 | 61,027 |
MMBtu
|
$2.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $351,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $233,011 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $65,300 | $424,200 |
$65,300
1,658,851
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15,232 | $12,982 |
$15,232
387,163
kWh
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $9,071 | $1,100 | - |
$9,071
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $240 | $67 | - |
$240
-
MMBtu
|
|
05 | 2.2121: Increase amount of condensate returned | $58,800 | $14,000 | - |
$58,800
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $77,400 | $750 | - |
$77,400
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $990 | $50 |
$990
25,205
kWh
|
- | |
08 | 2.4235: Remove or close off unneeded compressed air lines | $22,200 | - |
$22,200
575,322
kWh
|
- | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $102,300 | $85,000 | - |
$102,300
-
MMBtu
|
|
TOTAL RECOMMENDED | $351,533 | $538,149 |
$103,722
2,646,541
kWh
|
$247,811
-
MMBtu
|
||
TOTAL IMPLEMENTED | $233,011 | $440,117 |
$87,500
2,234,173
kWh
|
$145,511
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs