| Assessment Year | 1985 |
|---|---|
| Principal Product | FREQUENCY CRYSTALS |
| NAICS |
n/a
|
| SIC | 3679: Electronic Components, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 115 |
| Plant Area |
n/a
|
| Annual Production | 3,600,000
pieces
|
| Production Hrs. Annual | 4,186
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $37,164 | 550,117 |
kWh
|
$0.068 |
| Natural Gas | $8,347 | 1,964 |
MMBtu
|
$4.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,446 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,938 | $798 |
$1,938
28,722
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $511 | $300 | - |
$511
-
MMBtu
|
|
| 03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $17,952 | $100 |
$17,952
265,826
kWh
|
- | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $54 | $92 | - |
$54
-
MMBtu
|
|
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $304 | $51 |
$71
1,172
kWh
|
$233
-
MMBtu
|
|
| 06 | 2.2515: Use optimum thickness insulation | $550 | $210 | - |
$550
-
MMBtu
|
|
| 07 | 2.7261: Install timers and/or thermostats | $8,891 | $2,400 |
$6,485
96,131
kWh
|
$2,406
-
MMBtu
|
|
| 08 | 2.5122: Replace high resistance ducts, pipes, and fittings | $246 | $50 |
$246
3,517
kWh
|
- | |
| 09 | 2.7233: Use properly designed and sized hvac equipment | $863 | $500 |
$863
12,896
kWh
|
- | |
| TOTAL RECOMMENDED | $31,309 | $4,501 |
$27,555
408,264
kWh
|
$3,754
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $30,446 | $4,001 |
$26,692
395,368
kWh
|
$3,754
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs