Assessment Year | 1985 |
---|---|
Principal Product | FREQUENCY CRYSTALS |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 115 |
Plant Area |
n/a
|
Annual Production | 3,600,000
pieces
|
Production Hrs. Annual | 4,186
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,164 | 550,117 |
kWh
|
$0.068 |
Natural Gas | $8,347 | 1,964 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,446 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,938 | $798 |
$1,938
28,722
kWh
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $511 | $300 | - |
$511
-
MMBtu
|
|
03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $17,952 | $100 |
$17,952
265,826
kWh
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $54 | $92 | - |
$54
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $304 | $51 |
$71
1,172
kWh
|
$233
-
MMBtu
|
|
06 | 2.2515: Use optimum thickness insulation | $550 | $210 | - |
$550
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $8,891 | $2,400 |
$6,485
96,131
kWh
|
$2,406
-
MMBtu
|
|
08 | 2.5122: Replace high resistance ducts, pipes, and fittings | $246 | $50 |
$246
3,517
kWh
|
- | |
09 | 2.7233: Use properly designed and sized hvac equipment | $863 | $500 |
$863
12,896
kWh
|
- | |
TOTAL RECOMMENDED | $31,309 | $4,501 |
$27,555
408,264
kWh
|
$3,754
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,446 | $4,001 |
$26,692
395,368
kWh
|
$3,754
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs