ITAC Assessment: WI0124
ITAC logo
ITAC Assessment: WI0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 575,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,172 3,260,844
kWh
Natural Gas $43,103 13,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,033 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $7,961 $800 $4,992
79,426
kWh
$2,969
-
MMBtu
02 2.7261: Install timers and/or thermostats $6,843 $1,800 - $6,843
-
MMBtu
03 2.3191: Use demand controller or load shedder $3,982 $10,000 $3,982
-
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,444 $1,400 $1,859
29,601
kWh
$(-415.0)
-
MMBtu
05 2.6232: Install set-back timers $1,202 $400 $1,202
19,050
kWh
-
06 2.2437: Recover waste heat from equipment $791 $2,100 - $791
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $300 $640 $300
4,689
kWh
-
08 2.6124: Establish equipment maintenance schedule $763 - $763
14,068
kWh
-
09 2.4133: Use most efficient type of electric motors $243 $1,146 $243
3,810
kWh
-
10 2.7111: Reduce illumination to minimum necessary levels $192 - $192
2,931
kWh
-
11 2.4312: Improve lubrication practices $166 - $166
2,638
kWh
-
12 2.6212: Turn off equipment during breaks, reduce operating time $146 - $146
2,345
kWh
-
TOTAL RECOMMENDED $24,033 $18,286 $13,845
158,558
kWh
$10,188
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs