ITAC Assessment: GT0549
ITAC logo
ITAC Assessment: GT0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Programmable Logic Controllers
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 345
Plant Area 50,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,290 7,199,590
kWh
Natural Gas $9,700 1,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,100 $50,690 $21,100
286,342
kWh
-
02 2.7122: Disconnect ballasts $11,120 $2,895 $11,120
221,278
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,430 $400 $1,430
28,429
kWh
-
04 2.3191: Use demand controller or load shedder $19,500 $24,000 $19,500
457,210
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,520 $3,000 - $4,520
-
MMBtu
06 2.7491: Insulate glazing, walls, ceilings, and roofs $18,200 $168,000 $18,200
345,838
kWh
-
07 2.3137: Use power during off-peak periods $1,830 $4,000 $1,830
-
kWh
-
TOTAL RECOMMENDED $77,700 $252,985 $73,180
1,339,097
kWh
$4,520
-
MMBtu
TOTAL IMPLEMENTED $71,350 $245,985 $71,350
1,339,097
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs