*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Lumber for furniture
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 150,000
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,640 3,286,100
kWh
Electricity Demand $37,561 8,241
kW-mo/yr
Electricity Fees $5,245 -
LPG $6,000 356
MMBtu
Wood $1 37,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,196 - $835
15,709
kWh
$361
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $575 $100 $988
18,575
kWh
$427
-
kW-mo/yr
- $(-600.0) - $(-240.0)
03 2.2437: Recover waste heat from equipment $1,573 $7,197 $(-79.0)
(-1,492)
kWh
$(-34.0)
-
kW-mo/yr
$1,686
-
MMBtu
- - -
04 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $17,271 $73,750 $15,720
295,650
kWh
$1,551
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $336 $126 $236
4,402
kWh
$100
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,698 $7,891 $1,190
22,372
kWh
$514
-
kW-mo/yr
- - $(-6.0) -
TOTAL RECOMMENDED $22,649 $89,064 $18,890
355,216
kWh
$2,919
-
kW-mo/yr
$1,686
-
MMBtu
$(-600.0) $(-6.0) $(-240.0)
TOTAL IMPLEMENTED $3,805 $8,117 $3,249
61,058
kWh
$1,402
-
kW-mo/yr
- $(-600.0) $(-6.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs