Assessment Year | 2012 |
---|---|
Principal Product | Lumber for furniture |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
150,000
ft2
|
Annual Production | 13,000
thousand feet
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $159,640 | 3,286,100 |
kWh
|
$0.049 |
Electricity Demand | $37,561 | 8,241 |
kW-mo/yr
|
$4.56 |
Electricity Fees | $5,245 | - |
|
- |
LPG | $6,000 | 356 |
MMBtu
|
$16.85 |
Wood | $1 | 37,600 |
MMBtu
|
$0.000 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,649 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,196 | - |
$835
15,709
kWh
|
$361
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $575 | $100 |
$988
18,575
kWh
|
$427
-
kW-mo/yr
|
- | $(-600.0) | - | $(-240.0) | |
03 | 2.2437: Recover waste heat from equipment | $1,573 | $7,197 |
$(-79.0)
(-1,492)
kWh
|
$(-34.0)
-
kW-mo/yr
|
$1,686
-
MMBtu
|
- | - | - | |
04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $17,271 | $73,750 |
$15,720
295,650
kWh
|
$1,551
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $336 | $126 |
$236
4,402
kWh
|
$100
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,698 | $7,891 |
$1,190
22,372
kWh
|
$514
-
kW-mo/yr
|
- | - | $(-6.0) | - | |
TOTAL RECOMMENDED | $22,649 | $89,064 |
$18,890
355,216
kWh
|
$2,919
-
kW-mo/yr
|
$1,686
-
MMBtu
|
$(-600.0) | $(-6.0) | $(-240.0) | ||
TOTAL IMPLEMENTED | $3,805 | $8,117 |
$3,249
61,058
kWh
|
$1,402
-
kW-mo/yr
|
- | $(-600.0) | $(-6.0) | $(-240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs