Assessment Year | 1991 |
---|---|
Principal Product | THREADED BELTS |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $398,773 | 5,769,637 |
kWh
|
$0.069 |
Natural Gas | $192,977 | 64,022 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,415 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7494: Install storm windows and doors | $11,035 | $46,642 | - |
$11,035
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,766 | $951 |
$5,766
83,529
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,946 | $5,600 | - |
$2,946
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,556 | $5,000 | - |
$2,556
-
MMBtu
|
|
05 | 2.6232: Install set-back timers | $1,860 | - |
$1,860
26,964
kWh
|
- | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $912 | - |
$912
-
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,455 | $640 |
$1,455
21,102
kWh
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $1,292 | $429 | - |
$1,292
-
MMBtu
|
|
09 | 2.7226: Use computer programs to optimize hvac performance | $825 | $700 |
$825
12,016
kWh
|
- | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $768 | $500 | - |
$768
-
MMBtu
|
|
TOTAL RECOMMENDED | $29,415 | $60,462 |
$10,818
143,611
kWh
|
$18,597
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs