Assessment Year | 1995 |
---|---|
Principal Product | Aircraft electronics |
NAICS |
n/a
|
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $10 M to 50M |
# of Employees | 178 |
Plant Area |
102,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,854 | 4,994,725 |
kWh
|
$0.044 |
Natural Gas | $26,434 | 6,568 |
MMBtu
|
$4.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7131: Add area lighting switches | $2,470 | $300 |
$2,470
38,394
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,910 | $4,320 |
$1,910
43,376
kWh
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,400 | $5,210 |
$1,400
32,239
kWh
|
|
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,180 | $2,680 |
$1,180
31,067
kWh
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $980 | $900 |
$980
23,740
kWh
|
|
06 | 2.4133: Use most efficient type of electric motors | $930 | $1,250 |
$930
24,326
kWh
|
|
07 | 2.4131: Size electric motors for peak operating efficiency | $170 | - |
$170
4,689
kWh
|
|
TOTAL RECOMMENDED | $9,040 | $14,660 |
$9,040
197,831
kWh
|
||
TOTAL IMPLEMENTED | $3,090 | $4,830 |
$3,090
79,133
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs