ITAC Assessment: CO0343
ITAC logo
ITAC Assessment: CO0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aircraft electronics
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 178
Plant Area 102,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 3,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,854 4,994,725
kWh
Natural Gas $26,434 6,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7131: Add area lighting switches $2,470 $300 $2,470
38,394
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,910 $4,320 $1,910
43,376
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,400 $5,210 $1,400
32,239
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,180 $2,680 $1,180
31,067
kWh
05 2.4221: Install compressor air intakes in coolest locations $980 $900 $980
23,740
kWh
06 2.4133: Use most efficient type of electric motors $930 $1,250 $930
24,326
kWh
07 2.4131: Size electric motors for peak operating efficiency $170 - $170
4,689
kWh
TOTAL RECOMMENDED $9,040 $14,660 $9,040
197,831
kWh
TOTAL IMPLEMENTED $3,090 $4,830 $3,090
79,133
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs