ITAC Assessment: DL0204
ITAC logo
ITAC Assessment: DL0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Logistics service provider for restaurant chains
NAICS 541614: Process, Physical Distribution, and Logistics Consulting Services
SIC 4731: Arrangement of Transportation of Freight and Cargo
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 400,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,290
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,647 4,731,088
kWh
Electricity Demand $34,362 8,612
kW-mo/yr
Electricity Fees $1,829 -
Natural Gas $27,943 3,267
MMBtu
Waste Disposal Costs
Water Usage $93,849 4,489
Tgal
TOTAL YEARLY COSTS $422,630
RECOMMENDED SAVINGS* $89,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $18,234 - $16,208
289,431
kWh
$2,026
-
kW-mo/yr
-
02 2.2211: Use optimum temperature $1,182 - $63
1,122
kWh
$7
-
kW-mo/yr
$1,112
-
MMBtu
03 2.7261: Install timers and/or thermostats $491 $45 $53
947
kWh
$7
-
kW-mo/yr
$431
-
MMBtu
04 2.4151: Develop a repair/replace policy $32,583 $1,300 $28,963
517,194
kWh
$3,620
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,599 $24,771 $18,310
326,972
kWh
$2,289
-
kW-mo/yr
-
06 2.7313: Recycle air for heating, ventilation and air conditioning $8,754 $18,145 - - $8,754
-
MMBtu
07 2.6122: Adjust vents to minimize energy use $836 $465 - - $836
-
MMBtu
08 2.7224: Reduce space conditioning during non-working hours $6,857 - - - $6,857
-
MMBtu
TOTAL RECOMMENDED $89,536 $44,726 $63,597
1,135,666
kWh
$7,949
-
kW-mo/yr
$17,990
-
MMBtu
TOTAL IMPLEMENTED $2,509 $510 $116
2,069
kWh
$14
-
kW-mo/yr
$2,379
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs