ITAC Assessment: GT0728
ITAC logo
ITAC Assessment: GT0728
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Extruded Plastic
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 34,500
ft2
Annual Production 5,047,243
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,777 1,032,000
kWh
Natural Gas $2,933 254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,492 $750 $599
17,200
kWh
$1,856
-
kW-mo/yr
- $37 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,952 $6,346 $698
20,079
kWh
$1,225
-
kW-mo/yr
- $29 -
03 3.7311: Maintain machines to reduce leaks $2,765 $3,150 - - $1,269
-
lb
- $1,496
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,916 - - $13,710
-
kW-mo/yr
- $206 -
05 2.2511: Insulate bare equipment $2,356 $1,555 $1,417
35,644
kWh
$939
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $23,481 $11,801 $2,714
72,923
kWh
$17,730
-
kW-mo/yr
$1,269
-
lb
$272 $1,496
TOTAL IMPLEMENTED $18,360 $7,096 $1,297
37,279
kWh
$16,791
-
kW-mo/yr
- $272 -