Assessment Year | 2002 |
---|---|
Principal Product | Extruded Plastic |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 4 |
Plant Area |
34,500
ft2
|
Annual Production | 5,047,243
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,777 | 1,032,000 |
kWh
|
$0.084 |
Natural Gas | $2,933 | 254 |
MMBtu
|
$11.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,492 | $750 |
$599
17,200
kWh
|
$1,856
-
kW-mo/yr
|
- | $37 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,952 | $6,346 |
$698
20,079
kWh
|
$1,225
-
kW-mo/yr
|
- | $29 | - | |
03 | 3.7311: Maintain machines to reduce leaks | $2,765 | $3,150 | - | - |
$1,269
-
lb
|
- | $1,496 | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $13,916 | - | - |
$13,710
-
kW-mo/yr
|
- | $206 | - | |
05 | 2.2511: Insulate bare equipment | $2,356 | $1,555 |
$1,417
35,644
kWh
|
$939
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $23,481 | $11,801 |
$2,714
72,923
kWh
|
$17,730
-
kW-mo/yr
|
$1,269
-
lb
|
$272 | $1,496 | ||
TOTAL IMPLEMENTED | $18,360 | $7,096 |
$1,297
37,279
kWh
|
$16,791
-
kW-mo/yr
|
- | $272 | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs