Assessment Year | 1990 |
---|---|
Principal Product | STEEL WOOL |
NAICS |
n/a
|
SIC | 3291: Abrasive Products |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $265,669 | 3,080,305 |
kWh
|
$0.086 |
Natural Gas | $62,685 | 13,745 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,948 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $10,875 | $1,250 | - |
$10,875
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,254 | - |
$3,654
-
kWh
|
- | $(-400.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,146 | $432 |
$3,146
36,342
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $1,696 | $1,400 |
$1,696
19,637
kWh
|
- | - | |
05 | 2.7494: Install storm windows and doors | $2,224 | $4,448 | - |
$2,224
-
MMBtu
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,016 | $600 | - |
$1,016
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,271 | $2,032 |
$1,271
14,654
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,002 | $500 | - |
$1,002
-
MMBtu
|
- | |
09 | 2.2437: Recover waste heat from equipment | $632 | $500 | - |
$632
-
MMBtu
|
- | |
10 | 2.4221: Install compressor air intakes in coolest locations | $445 | $1,000 |
$445
5,275
kWh
|
- | - | |
11 | 2.6121: Reduce hot water temperature to the minimum required | $213 | - | - |
$213
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $25,774 | $12,162 |
$10,212
75,908
kWh
|
$15,962
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $17,948 | $4,182 |
$4,842
55,979
kWh
|
$13,106
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs