Assessment Year | 1990 |
---|---|
Principal Product | DISPOSABLE HOSPITAL PRODUCTS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $669,447 | 9,119,871 |
kWh
|
$0.073 |
Natural Gas | $23,083 | 6,995 |
MMBtu
|
$3.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,989 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,116 | $137 |
$6,116
83,236
kWh
|
- | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $5,431 | - |
$5,431
-
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,037 | $14,700 | - |
$5,037
-
MMBtu
|
|
04 | 2.4133: Use most efficient type of electric motors | $373 | $473 |
$373
4,982
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,799 | $1,000 |
$1,799
24,619
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $575 | - |
$575
7,913
kWh
|
- | |
07 | 2.7261: Install timers and/or thermostats | $792 | $250 | - |
$792
-
MMBtu
|
|
08 | 2.6121: Reduce hot water temperature to the minimum required | $100 | - |
$100
1,465
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,766 | $1,600 |
$1,766
24,033
kWh
|
- | |
TOTAL RECOMMENDED | $21,989 | $18,160 |
$16,160
146,248
kWh
|
$5,829
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,000 | $16,310 |
$8,963
122,215
kWh
|
$5,037
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs