Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pet treats, Beef and hog box/treats
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 960,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,553 1,184,320
kWh
Natural Gas $83,623 20,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $313,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,486

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,948 $775 - $4,948
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,063 - $1,063
16,902
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $475 $1,937 $475
7,558
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,350 $11,729 $2,350
24,081
kWh
-
05 2.9141: Install anaerobic digester $304,567 $240,000 - $304,567
-
MMBtu
TOTAL RECOMMENDED $313,403 $254,441 $3,888
48,541
kWh
$309,515
-
MMBtu
TOTAL IMPLEMENTED $6,486 $2,712 $1,538
24,460
kWh
$4,948
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs