ITAC Assessment: SF0437
ITAC logo
ITAC Assessment: SF0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Screen and Digital Printing
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 65,000
ft2
Annual Production 100
units
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,268 995,642
kWh
Natural Gas $2,789 229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $911 - $694
3,671
kWh
- $217
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $620 - $620
3,279
kWh
- -
03 2.7135: Install occupancy sensors $3,792 $6,796 $3,792
20,050
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $425 $729 $425
2,245
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $354 $1,395 $488
2,582
kWh
- $(-134.0)
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,497 $14,135 $6,766
37,202
kWh
$(-269.0) -
07 2.8114: Change rate schedules or other changes in utility service $28,111 $46,338 - $28,111 -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $15,796 $43,156 - $15,796 -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,489 $13,500 - $2,489 -
TOTAL RECOMMENDED $58,995 $126,049 $12,785
69,029
kWh
$46,127 $83
-
MMBtu
TOTAL IMPLEMENTED $29,910 $78,316 $11,677
63,168
kWh
$18,016 $217
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs