Assessment Year | 1990 |
---|---|
Principal Product | PACKAGING FOR CANS |
NAICS |
n/a
|
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 278,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,323 | 3,776,964 |
kWh
|
$0.039 |
Natural Gas | $97,493 | 31,414 |
MMBtu
|
$3.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,353 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $2,402 | $2,500 | - |
$2,402
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $1,684 | $900 | - |
$1,684
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,216 | $500 | - |
$1,216
-
MMBtu
|
|
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $56 | $66 | - |
$56
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $362 | $759 |
$362
9,379
kWh
|
- | |
06 | 2.6232: Install set-back timers | $439 | $200 |
$439
11,430
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $999 | $705 |
$999
25,791
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $176 | - |
$176
4,396
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $990 | $1,400 | - |
$990
-
MMBtu
|
|
10 | 2.7226: Use computer programs to optimize hvac performance | $900 | $2,000 |
$900
23,154
kWh
|
- | |
11 | 2.7261: Install timers and/or thermostats | $381 | $350 | - |
$381
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,605 | $9,380 |
$2,876
74,150
kWh
|
$6,729
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,353 | $5,221 |
$1,614
41,617
kWh
|
$5,739
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs