| Assessment Year | 1999 |
|---|---|
| Principal Product | Centrfiugal pump parts |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 109 |
| Plant Area |
58,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $131,362 | 2,138,335 |
kWh
|
$0.061 |
| Natural Gas | $30,854 | 5,082 |
MMBtu
|
$6.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $34,014 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,495 | $265 | - |
$2,495
-
MMBtu
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $847 | $180 |
$847
13,775
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,864 | $600 |
$2,864
46,600
kWh
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $2,084 | $98 | - |
$2,084
-
MMBtu
|
- | - | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $5,095 | $4,400 | - |
$5,095
-
MMBtu
|
- | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $7,114 | $300 |
$7,114
115,768
kWh
|
- | - | - | |
| 07 | 2.2511: Insulate bare equipment | $486 | $450 |
$486
7,913
kWh
|
- | - | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $750 | $40 |
$750
12,016
kWh
|
- | - | - | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,644 | $11,000 | - | - |
$2,644
-
lb
|
- | |
| 10 | 3.5316: Contract a wood pallet recycling company | $576 | $42 | - | - |
$576
-
lb
|
- | |
| 11 | 4.111: Add equipment/ operators to reduce production bottleneck | $16,640 | $720 | - | - | - | $16,640 | |
| 12 | 4.812: Apply for investment incentives | $21,376 | - | - | - | - | $21,376 | |
| TOTAL RECOMMENDED | $62,971 | $18,095 |
$12,061
196,072
kWh
|
$9,674
-
MMBtu
|
$3,220
-
lb
|
$38,016 | ||
| TOTAL IMPLEMENTED | $34,014 | $1,040 |
$9,978
162,368
kWh
|
$2,084
-
MMBtu
|
$576
-
lb
|
$21,376 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs