Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 462
Plant Area 67,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $493,327 7,462,700
kWh
Electricity Demand $165,203 16,360
kW-mo/yr
Electricity Fees $104,312 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2628: Utilize a less expensive cooling method $75,489 $140,000 $46,020
696,219
kWh
$11,269
-
kW-mo/yr
$18,200
02 2.7292: Lower ceiling to reduce conditioned space $54,079 $166,590 $43,446
657,270
kWh
$10,633
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $20,030 $160 $16,091
243,433
kWh
$3,939
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,361 $1,660 $13,502
204,260
kWh
$4,859
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,483 $9,820 $5,483
83,089
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $2,494 $1,400 $1,999
30,287
kWh
$495
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $942 $40 $619
9,372
kWh
$323
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $688 $639 $553
8,369
kWh
$135
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $684 $177 $684
10,356
kWh
- -
TOTAL RECOMMENDED $178,250 $320,486 $128,397
1,942,655
kWh
$31,653
-
kW-mo/yr
$18,200
TOTAL IMPLEMENTED $44,562 $12,279 $35,629
539,151
kWh
$8,933
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs