| Assessment Year | 1990 |
|---|---|
| Principal Product | PRECISION MACHINING |
| NAICS |
n/a
|
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $211,192 | 2,726,260 |
kWh
|
$0.077 |
| Natural Gas | $17,075 | 3,897 |
MMBtu
|
$4.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,226 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $6,079 | - |
$6,079
78,546
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,874 | $6,425 |
$4,874
63,013
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,560 | $3,018 |
$5,560
71,805
kWh
|
- | |
| 04 | 2.6232: Install set-back timers | $2,297 | $1,600 |
$2,297
29,601
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $1,501 | $1,500 | - |
$1,501
-
MMBtu
|
|
| 06 | 2.7226: Use computer programs to optimize hvac performance | $1,366 | $4,800 |
$1,366
17,585
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,255 | $1,000 |
$1,255
16,120
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,027 | - |
$1,027
13,189
kWh
|
- | |
| 09 | 2.6121: Reduce hot water temperature to the minimum required | $370 | - |
$370
4,689
kWh
|
- | |
| 10 | 2.7261: Install timers and/or thermostats | $1,991 | $520 | - |
$1,991
-
MMBtu
|
|
| TOTAL RECOMMENDED | $26,320 | $18,863 |
$22,828
294,548
kWh
|
$3,492
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,226 | $7,945 |
$13,235
170,868
kWh
|
$1,991
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs