ITAC Assessment: AR0096
ITAC logo
ITAC Assessment: AR0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fiberglass Tubing
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 48,400
ft2
Annual Production 80,290
thousand feet
Production Hrs. Annual 3,441
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,224 467,761
kWh
Electricity Demand $15,874 1,660
kW-mo/yr
Natural Gas $12,011 2,730
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $7,955 $1,631 $3,119
84,994
kWh
$4,836
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,513 $477 $1,156
30,481
kWh
$1,357
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $4,384 $4,700 $2,888
44,256
kWh
$1,496
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $608 $80 $258
7,913
kWh
$350
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,100 $70 $444
13,482
kWh
$656
-
kW-mo/yr
-
06 3.7311: Maintain machines to reduce leaks $2,580 $100 - - $2,580
-
gal
TOTAL RECOMMENDED $19,140 $7,058 $7,865
181,126
kWh
$8,695
-
kW-mo/yr
$2,580
-
gal
TOTAL IMPLEMENTED $19,140 $7,058 $7,865
181,126
kWh
$8,695
-
kW-mo/yr
$2,580
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs