Assessment Year | 1996 |
---|---|
Principal Product | Fiberglass Tubing |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
48,400
ft2
|
Annual Production | 80,290
thousand feet
|
Production Hrs. Annual | 3,441
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $23,224 | 467,761 |
kWh
|
$0.050 |
Electricity Demand | $15,874 | 1,660 |
kW-mo/yr
|
$9.56 |
Natural Gas | $12,011 | 2,730 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $7,955 | $1,631 |
$3,119
84,994
kWh
|
$4,836
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,513 | $477 |
$1,156
30,481
kWh
|
$1,357
-
kW-mo/yr
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,384 | $4,700 |
$2,888
44,256
kWh
|
$1,496
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $608 | $80 |
$258
7,913
kWh
|
$350
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,100 | $70 |
$444
13,482
kWh
|
$656
-
kW-mo/yr
|
- | |
06 | 3.7311: Maintain machines to reduce leaks | $2,580 | $100 | - | - |
$2,580
-
gal
|
|
TOTAL RECOMMENDED | $19,140 | $7,058 |
$7,865
181,126
kWh
|
$8,695
-
kW-mo/yr
|
$2,580
-
gal
|
||
TOTAL IMPLEMENTED | $19,140 | $7,058 |
$7,865
181,126
kWh
|
$8,695
-
kW-mo/yr
|
$2,580
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs