ITAC Assessment: UU0114
ITAC logo
ITAC Assessment: UU0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Bread and Bread Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 222
Plant Area 117,000
ft2
Annual Production 93,263,418
lb
Production Hrs. Annual 8,712
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,177 6,149,531
kWh
Electricity Demand $156,101 12,532
kW-mo/yr
Electricity Fees $124,508 -
Natural Gas $155,886 52,247
MMBtu
Waste Disposal Costs
Water Usage $14,395 7
Tgal
TOTAL YEARLY COSTS $674,066
RECOMMENDED SAVINGS* $63,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $4,236 $180 $4,236
89,681
kWh
- - -
02 2.3212: Optimize plant power factor $14,409 $30,000 - - $14,409 -
03 2.1233: Analyze flue gas for proper air/fuel ratio $18,931 - - - - $18,931
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,795 $1,315 - - - $2,795
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $17,973 $39,045 $17,024
469,082
kWh
$717
-
kW-mo/yr
$233 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,345 - $5,081
140,014
kWh
$199
-
kW-mo/yr
$65 -
TOTAL RECOMMENDED $63,689 $70,540 $26,341
698,777
kWh
$916
-
kW-mo/yr
$14,706 $21,726
-
MMBtu
TOTAL IMPLEMENTED $46,485 $39,225 $26,341
698,777
kWh
$916
-
kW-mo/yr
$297 $18,931
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs