| Assessment Year | 1990 |
|---|---|
| Principal Product | PLASTIC BOTTLES |
| NAICS |
n/a
|
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 150,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,183,827 | 20,482,708 |
kWh
|
$0.058 |
| Natural Gas | $61,595 | 17,359 |
MMBtu
|
$3.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,264 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3132: Recharge batteries on during off-peak demand periods | $15,710 | $6,000 |
$15,710
-
kWh
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $509 | $1,200 | - |
$509
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,745 | $20,000 |
$7,745
133,939
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $121 | $46 |
$121
2,052
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $5,833 | $2,500 |
$5,833
100,821
kWh
|
- | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,135 | $1,200 | - |
$1,135
-
MMBtu
|
|
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $930 | $2,397 |
$930
16,120
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $281 | - |
$281
4,982
kWh
|
- | |
| TOTAL RECOMMENDED | $32,264 | $33,343 |
$30,620
257,914
kWh
|
$1,644
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs