ITAC Assessment: WI0088
ITAC logo
ITAC Assessment: WI0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BEVERAGE CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $836,213 13,812,134
kWh
Natural Gas $210,984 63,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $17,860 $9,500 - $17,860
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,176 $3,417 $7,176
118,699
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,084 $2,350 $1,084
17,878
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,383 $1,000 $3,383
55,979
kWh
-
05 2.6232: Install set-back timers $1,586 $600 $1,586
26,084
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $674 $600 - $674
-
MMBtu
TOTAL RECOMMENDED $31,763 $17,467 $13,229
218,640
kWh
$18,534
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs