ITAC Assessment: CO0124
ITAC logo
ITAC Assessment: CO0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product EMISSION MEASURE EQUIPMENT
NAICS
n/a
SIC 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 2,652
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,842 1,692,849
kWh
Natural Gas $22,233 5,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $834 $300 $90
1,758
kWh
$744
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $1,162 - $431
11,723
kWh
$756
-
MMBtu
$(-25.0)
03 2.7229: Air condition only space necessary $1,645 $1,000 - $1,645
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,150 $1,200 - $1,150
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $881 $969 $881
17,585
kWh
- -
TOTAL RECOMMENDED $5,672 $3,469 $1,402
31,066
kWh
$4,295
-
MMBtu
$(-25.0)
TOTAL IMPLEMENTED $5,672 $3,469 $1,402
31,066
kWh
$4,295
-
MMBtu
$(-25.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs