ITAC Assessment: WI0087
ITAC logo
ITAC Assessment: WI0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SCREWS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,743 2,922,919
kWh
Natural Gas $59,187 11,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $30,592 $500 - $30,592
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $5,728 $5,806 $(-604.0)
(-6,741)
kWh
$6,332
-
MMBtu
03 2.3191: Use demand controller or load shedder $5,580 $10,000 $5,580
-
kWh
-
04 2.7261: Install timers and/or thermostats $3,371 $1,500 - $3,371
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,928 $1,000 $1,928
21,688
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $495 $600 - $495
-
MMBtu
07 2.7494: Install storm windows and doors $344 $1,134 - $344
-
MMBtu
08 2.6232: Install set-back timers $386 $400 $386
4,396
kWh
-
09 2.6121: Reduce hot water temperature to the minimum required $285 - - $285
-
MMBtu
TOTAL RECOMMENDED $48,709 $20,940 $7,290
19,343
kWh
$41,419
-
MMBtu
TOTAL IMPLEMENTED $36,906 $4,534 $2,314
26,084
kWh
$34,592
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs