ITAC Assessment: WI0084
ITAC logo
ITAC Assessment: WI0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ALUMINUM & ZINC CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,958 4,213,365
kWh
Natural Gas $137,208 41,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $23,340 - $25,740
-
kWh
- $(-2,400.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,910 $2,000 $2,910
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $705 $1,328 $705
9,379
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $930 $2,000 $930
12,309
kWh
- -
05 2.6232: Install set-back timers $730 $600 $730
9,672
kWh
- -
06 2.7261: Install timers and/or thermostats $478 $250 - $478
-
MMBtu
-
TOTAL RECOMMENDED $29,093 $6,178 $31,015
31,360
kWh
$478
-
MMBtu
$(-2,400.0)
TOTAL IMPLEMENTED $5,023 $5,578 $4,545
21,688
kWh
$478
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs