Assessment Year | 1989 |
---|---|
Principal Product | RESINS |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,053 | 356,975 |
kWh
|
$0.073 |
Natural Gas | $19,512 | 4,039 |
MMBtu
|
$4.83 |
Fuel Oil #2 | $44,773 | 8,960 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,157 | $3,100 | - | - |
$3,157
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,866 | $500 | - | - |
$2,866
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,210 | $5,000 | - | - |
$2,210
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $898 | $250 | - |
$898
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $227 | $104 |
$227
3,224
kWh
|
- | - | |
06 | 2.7494: Install storm windows and doors | $671 | $1,144 | - | - |
$671
-
MMBtu
|
|
07 | 2.4312: Improve lubrication practices | $590 | - |
$590
8,206
kWh
|
- | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $291 | $700 |
$406
5,569
kWh
|
$(-115.0)
-
MMBtu
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $245 | $165 | - | - |
$245
-
MMBtu
|
|
10 | 2.6232: Install set-back timers | $74 | $200 |
$74
1,172
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,229 | $11,163 |
$1,297
18,171
kWh
|
$783
-
MMBtu
|
$9,149
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,198 | $4,763 |
$227
3,224
kWh
|
$898
-
MMBtu
|
$4,073
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs