ITAC Assessment: WI0070
ITAC logo
ITAC Assessment: WI0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TRUCK & TRAILER SPRINGS
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 14,500
ton
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,206 4,630,422
kWh
Natural Gas $494,696 144,822
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,544 $28,341 $27,544
347,304
kWh
-
02 2.3132: Recharge batteries on during off-peak demand periods $16,961 - $16,961
-
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $4,871 $2,400 - $4,871
-
MMBtu
04 2.7261: Install timers and/or thermostats $3,122 $250 - $3,122
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $1,255 $1,000 $1,255
15,826
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $409 - $409
5,275
kWh
-
TOTAL RECOMMENDED $54,162 $31,991 $46,169
368,405
kWh
$7,993
-
MMBtu
TOTAL IMPLEMENTED $44,914 $28,341 $44,914
352,579
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs