ITAC Assessment: MS0344
ITAC logo
ITAC Assessment: MS0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 227
Plant Area 200,000
ft2
Annual Production 73,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,497 2,535,482
kWh
Electricity Demand $98,106 8,518
kW-mo/yr
Electricity Fees $13,086 -
Natural Gas $9,589 790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,223

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,805 $38,801 $10,253
184,338
kWh
$12,773
-
kW-mo/yr
$2,779 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,704 $9,325 $1,472
26,470
kWh
$1,833
-
kW-mo/yr
$399 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $908 $307 $894
16,067
kWh
- $14 - -
04 2.6214: Shut off pilots in standby equipment $621 $57 - - - $621
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $449 $1,470 $195
3,512
kWh
$247
-
kW-mo/yr
$7 - -
06 2.8123: Pay utility bills on time $185 - - - - - $185
TOTAL RECOMMENDED $31,672 $49,960 $12,814
230,387
kWh
$14,853
-
kW-mo/yr
$3,199 $621
-
MMBtu
$185
TOTAL IMPLEMENTED $31,223 $48,490 $12,619
226,875
kWh
$14,606
-
kW-mo/yr
$3,192 $621
-
MMBtu
$185
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs