Assessment Year | 1989 |
---|---|
Principal Product | TEXTILE FLOCK |
NAICS |
n/a
|
SIC | 2299: Textile goods, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 1,250,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,878 | 719,519 |
kWh
|
$0.073 |
Natural Gas | $88,805 | 27,621 |
MMBtu
|
$3.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,499 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $4,188 | - | - |
$4,188
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,100 | - |
$5,100
-
kWh
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $4,040 | $5,000 | - |
$4,040
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $2,536 | $750 | - |
$2,536
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,120 | $1,270 |
$1,120
15,240
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,671 | $500 | - |
$1,671
-
MMBtu
|
|
07 | 2.6218: Turn off equipment when not in use | $1,540 | $800 | - |
$1,540
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $825 | $3,000 |
$825
11,137
kWh
|
- | |
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $686 | $1,000 |
$844
11,430
kWh
|
$(-158.0)
-
MMBtu
|
|
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $640 | - |
$640
8,792
kWh
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,500 | $1,500 | - |
$1,500
-
MMBtu
|
|
12 | 2.7494: Install storm windows and doors | $432 | $1,488 | - |
$432
-
MMBtu
|
|
TOTAL RECOMMENDED | $24,278 | $15,308 |
$8,529
46,599
kWh
|
$15,749
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,499 | $4,008 |
$6,860
24,032
kWh
|
$4,639
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs