| Assessment Year | 1989 |
|---|---|
| Principal Product | VINYL FLOORING |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 205 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $264,863 | 5,822,978 |
kWh
|
$0.045 |
| Natural Gas | $179,743 | 38,364 |
MMBtu
|
$4.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,509 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,190 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4312: Improve lubrication practices | $12,658 | - |
$12,658
278,429
kWh
|
- | |
| 02 | 2.6218: Turn off equipment when not in use | $8,983 | $800 | - |
$8,983
-
MMBtu
|
|
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $7,916 | $5,000 | - |
$7,916
-
MMBtu
|
|
| 04 | 2.2437: Recover waste heat from equipment | $5,025 | $3,000 | - |
$5,025
-
MMBtu
|
|
| 05 | 2.3132: Recharge batteries on during off-peak demand periods | $2,400 | $3,750 |
$2,400
-
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,517 | $2,000 |
$1,517
33,411
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,374 | - |
$1,374
30,188
kWh
|
- | |
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $929 | $1,000 | - |
$929
-
MMBtu
|
|
| 09 | 2.6232: Install set-back timers | $449 | $400 |
$449
9,965
kWh
|
- | |
| 10 | 2.2511: Insulate bare equipment | $258 | $175 |
$305
6,741
kWh
|
$(-47.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $41,509 | $16,125 |
$18,703
358,734
kWh
|
$22,806
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $22,190 | $11,550 |
$5,291
63,599
kWh
|
$16,899
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs