Assessment Year | 2024 |
---|---|
Principal Product | Aircraft interior parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 559 |
Plant Area |
135,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $311,676 | 2,623,622 |
kWh
|
$0.12 | |
Electricity Demand | $477,997 | 11,579 |
kW-mo/yr
|
$41.28 | |
Natural Gas | $83,255 | 4,756 |
MMBtu
|
$17.51 | |
Waste Disposal Costs | |||||
Water Usage | $29,415 | 205,700 |
Tgal
|
$0.14 | |
TOTAL YEARLY COSTS | $902,343 | ||||
RECOMMENDED SAVINGS* | $344,234 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $179,675 | $962,431 |
$149,608
1,259,328
kWh
|
$30,067
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,301 | $7,684 |
$3,597
30,278
kWh
|
$2,704
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $676 | $680 |
$676
5,691
kWh
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $3,809 | $766 |
$3,173
26,713
kWh
|
$636
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,211 | $98 |
$1,211
10,196
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,763 | - |
$1,546
13,014
kWh
|
$217
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,620 | $1,986 |
$2,233
18,795
kWh
|
$387
-
kW-mo/yr
|
- | |
08 | 2.8112: Combine utility meters | $1,748 | - | - | - | $1,748 | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $146,431 | - | - |
$146,431
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $344,234 | $973,645 |
$162,044
1,364,015
kWh
|
$180,442
-
kW-mo/yr
|
$1,748 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs