ITAC Assessment: SJ0015
ITAC logo
ITAC Assessment: SJ0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Aircraft interior parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 559
Plant Area 135,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,676 2,623,622
kWh
Electricity Demand $477,997 11,579
kW-mo/yr
Natural Gas $83,255 4,756
MMBtu
Waste Disposal Costs
Water Usage $29,415 205,700
Tgal
TOTAL YEARLY COSTS $902,343
RECOMMENDED SAVINGS* $344,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $179,675 $962,431 $149,608
1,259,328
kWh
$30,067
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,301 $7,684 $3,597
30,278
kWh
$2,704
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $676 $680 $676
5,691
kWh
- -
04 2.6218: Turn off equipment when not in use $3,809 $766 $3,173
26,713
kWh
$636
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,211 $98 $1,211
10,196
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,763 - $1,546
13,014
kWh
$217
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,620 $1,986 $2,233
18,795
kWh
$387
-
kW-mo/yr
-
08 2.8112: Combine utility meters $1,748 - - - $1,748
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $146,431 - - $146,431
-
kW-mo/yr
-
TOTAL RECOMMENDED $344,234 $973,645 $162,044
1,364,015
kWh
$180,442
-
kW-mo/yr
$1,748
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs