Assessment Year | 1999 |
---|---|
Principal Product | injection molded trim |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
101,000
ft2
|
Annual Production | 400
ton
|
Production Hrs. Annual | 6,912
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $343,468 | 8,226,260 |
kWh
|
$0.042 |
Electricity Demand | $50,631 | 2,736 |
kW-mo/yr
|
$18.51 |
Electricity Fees | $65,815 | - |
|
- |
Natural Gas | $14,066 | 3,154 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,422 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,969 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $6,898 | $20,000 |
$6,898
250,879
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $453 | $1,250 |
$453
16,413
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,690 | $50 |
$2,690
97,890
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,660 | $2,500 |
$2,660
96,717
kWh
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $986 | $1,500 | - |
$986
-
MMBtu
|
- | |
06 | 3.1191: Change procedures / equipment / operating conditions | $735 | $100 | - | - |
$735
-
lb
|
|
TOTAL RECOMMENDED | $14,422 | $25,400 |
$12,701
461,899
kWh
|
$986
-
MMBtu
|
$735
-
lb
|
||
TOTAL IMPLEMENTED | $13,969 | $24,150 |
$12,248
445,486
kWh
|
$986
-
MMBtu
|
$735
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs