ITAC Assessment: UM0135
ITAC logo
ITAC Assessment: UM0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product injection molded trim
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 101,000
ft2
Annual Production 400
ton
Production Hrs. Annual 6,912
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,468 8,226,260
kWh
Electricity Demand $50,631 2,736
kW-mo/yr
Electricity Fees $65,815 -
Natural Gas $14,066 3,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.6231: Utilize controls to operate equipment only when needed $6,898 $20,000 $6,898
250,879
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $453 $1,250 $453
16,413
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,690 $50 $2,690
97,890
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $2,660 $2,500 $2,660
96,717
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $986 $1,500 - $986
-
MMBtu
-
06 3.1191: Change procedures / equipment / operating conditions $735 $100 - - $735
-
lb
TOTAL RECOMMENDED $14,422 $25,400 $12,701
461,899
kWh
$986
-
MMBtu
$735
-
lb
TOTAL IMPLEMENTED $13,969 $24,150 $12,248
445,486
kWh
$986
-
MMBtu
$735
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs