| Assessment Year | 2018 |
|---|---|
| Principal Product | Chassis, Automobile, Manufacturing |
| NAICS | 336111: Automobile Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
220,000
ft2
|
| Annual Production | 1,855,261
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $625,356 | 11,203,952 |
kWh
|
$0.056 | |
| Electricity Demand | $186,553 | 23,332 |
kW-mo/yr
|
$8.00 | |
| Electricity Fees | $8,804 | - |
|
- | |
| Natural Gas | $122,538 | 23,940 |
MMBtu
|
$5.12 | |
| Waste Disposal Costs | |||||
| Water Usage | $12,706 | 1,712 |
Tgal
|
$7.42 | |
| TOTAL YEARLY COSTS | $955,957 | ||||
| RECOMMENDED SAVINGS* | $151,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $121,098 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,357 | $20,012 |
$14,061
251,086
kWh
|
$4,296
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7145: Install skylights | $1,573 | $1,350 |
$1,573
28,082
kWh
|
- | - | - | - | |
| 03 | 2.7135: Install occupancy sensors | $3,813 | $2,725 |
$3,813
68,091
kWh
|
- | - | - | - | |
| 04 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,829 | $2,692 | - | - | - | - |
$4,829
-
Tgal
|
|
| 05 | 2.4238: Do not use compressed air for personal cooling | $6,490 | - |
$3,986
71,183
kWh
|
$2,504
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,186 | - |
$4,186
74,742
kWh
|
- | - | - | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $12,073 | - | - | - | - |
$12,073
-
MMBtu
|
- | |
| 08 | 2.4238: Do not use compressed air for personal cooling | $11,157 | $30,000 |
$3,141
56,088
kWh
|
$8,016
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,139 | $2,318 |
$8,139
145,345
kWh
|
- | - | - | - | |
| 10 | 2.4239: Eliminate or reduce compressed air usage | $3,074 | $3,248 |
$3,074
54,899
kWh
|
- | - | - | - | |
| 11 | 2.4221: Install compressor air intakes in coolest locations | $3,228 | $1,240 |
$3,228
57,644
kWh
|
- | - | - | - | |
| 12 | 2.2442: Preheat combustion air with waste heat | $7,060 | $15,293 | - | - | - |
$7,060
-
MMBtu
|
- | |
| 13 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,386 | - |
$2,583
46,120
kWh
|
- | - |
$10,803
-
MMBtu
|
- | |
| 14 | 2.2511: Insulate bare equipment | $492 | $316 | - | - | - |
$492
-
MMBtu
|
- | |
| 15 | 2.7442: Keep doors and windows shut when not on use | $946 | - |
$183
3,266
kWh
|
- | - |
$763
-
MMBtu
|
- | |
| 16 | 2.4151: Develop a repair/replace policy | $8,190 | $10,600 |
$6,430
114,816
kWh
|
$1,760
-
kW-mo/yr
|
- | - | - | |
| 17 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,465 | $300 |
$1,145
20,443
kWh
|
$320
-
kW-mo/yr
|
- | - | - | |
| 18 | 2.3212: Optimize plant power factor | $28,337 | $47,985 | - |
$28,337
-
kW-mo/yr
|
- | - | - | |
| 19 | 2.8114: Change rate schedules or other changes in utility service | $14,567 | - | - | - | $14,567 | - | - | |
| TOTAL RECOMMENDED | $151,362 | $138,079 |
$55,542
991,805
kWh
|
$45,233
-
kW-mo/yr
|
$14,567 |
$31,191
-
MMBtu
|
$4,829
-
Tgal
|
||
| TOTAL IMPLEMENTED | $121,098 | $115,606 |
$49,240
879,262
kWh
|
$45,233
-
kW-mo/yr
|
$14,567 |
$12,058
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs