ITAC Assessment: OK0942
ITAC logo
ITAC Assessment: OK0942
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Semiconductor Manufacturing
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 300,000
ft2
Annual Production 172,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,303,209 63,358,800
kWh
Electricity Demand $716,393 98,868
kW-mo/yr
Natural Gas $261,238 78,524
MMBtu
Waste Disposal Costs
Water Usage $504,620 89,662,000
Tgal
TOTAL YEARLY COSTS $4,785,460
RECOMMENDED SAVINGS* $565,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $3,767 $3,112 $3,767
72,445
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,283 $8,000 $17,283
332,369
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $972 $4,623 $815
15,673
kWh
$157
-
kW-mo/yr
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $73,902 $31,000 $73,902
1,421,200
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $600 $3,450 $500
9,617
kWh
$100
-
kW-mo/yr
-
06 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $469,328 $2,302,430 - - $469,328
TOTAL RECOMMENDED $565,852 $2,352,615 $96,267
1,851,304
kWh
$257
-
kW-mo/yr
$469,328
TOTAL IMPLEMENTED $5,339 $11,185 $5,082
97,735
kWh
$257
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs