Assessment Year | 2022 |
---|---|
Principal Product | Bread and donuts |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 20 |
Plant Area |
132,000
ft2
|
Annual Production | 36,687
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $712,337 | 9,517,300 |
kWh
|
$0.075 | |
Electricity Demand | $78,424 | 16,061 |
kW-mo/yr
|
$4.88 | |
Electricity Fees | $24,770 | - |
|
- | |
Natural Gas | $335,377 | 54,726 |
MMBtu
|
$6.13 | |
Waste Disposal Costs | |||||
Water Usage | $506 | 250 |
Tgal
|
$2.03 | |
TOTAL YEARLY COSTS | $1,151,414 | ||||
RECOMMENDED SAVINGS* | $477,190 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $473,464 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $55,456 | $51,203 |
$49,966
666,211
kWh
|
$5,490
-
kW-mo/yr
|
- | - | - | |
02 | 2.1213: Direct warmest air to combustion intake | $30,987 | $10,183 | - | - |
$30,987
-
MMBtu
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $29,479 | $16,283 |
$26,999
359,983
kWh
|
$2,480
-
kW-mo/yr
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $21,495 | $6,314 |
$(-161.4)
(-2,152)
kWh
|
$(-103.1)
-
kW-mo/yr
|
- | $21,760 | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $16,965 | $25,427 |
$16,965
226,198
kWh
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,147 | - |
$5,931
79,076
kWh
|
- | - | $101 | $115 | |
07 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $5,306 | $765 |
$5,306
70,750
kWh
|
- | - | - | - | |
08 | 2.1222: Install turbulators | $3,726 | $7,500 | - | - |
$3,726
-
MMBtu
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,828 | $2,002 | - | - |
$1,828
-
MMBtu
|
- | - | |
10 | 2.2121: Increase amount of condensate returned | $1,400 | $1,449 | - | - |
$1,400
-
MMBtu
|
- | - | |
11 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $284,508 | - | - | - | - | $284,508 | - | |
12 | 4.424: Improve space comfort conditioning | $19,893 | $5,851 |
$(-1,481.0)
(-19,740)
kWh
|
$(-386.0)
-
kW-mo/yr
|
- | $21,760 | - | |
TOTAL RECOMMENDED | $477,190 | $126,977 |
$103,525
1,380,326
kWh
|
$7,481
-
kW-mo/yr
|
$37,941
-
MMBtu
|
$328,129 | $115 | ||
TOTAL IMPLEMENTED | $473,464 | $119,477 |
$103,525
1,380,326
kWh
|
$7,481
-
kW-mo/yr
|
$34,215
-
MMBtu
|
$328,129 | $115 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs