ITAC Assessment: UF0437
ITAC logo
ITAC Assessment: UF0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Printed Material
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 154
Plant Area 45,960
ft2
Annual Production 2,760,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,882 3,869,640
kWh
Electricity Demand $141,868 10,918
kW-mo/yr
Electricity Fees $51,432 -
Natural Gas $49,999 4,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $7,679 $4,000 $7,679
71,108
kWh
- -
02 2.7243: Improve air circulation with destratification fans / other methods $20,263 $4,600 $20,263
187,626
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,562 $5,039 $7,066
99,216
kWh
$2,496
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $457 - $301
3,484
kWh
$156
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $3,443 $4,200 $3,443
47,825
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,608 $469 $1,608
14,891
kWh
- -
07 2.4235: Remove or close off unneeded compressed air lines $4,197 $1,979 $4,197
38,860
kWh
- -
08 2.4156: Establish a preventative maintenance program $3,387 $1,200 $3,387
31,369
kWh
- -
09 2.8113: Purchase gas directly from a contract gas supplier $4,523 - - - $4,523
TOTAL RECOMMENDED $55,119 $21,487 $47,944
494,379
kWh
$2,652
-
kW-mo/yr
$4,523
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs