ITAC Assessment: LE0596
ITAC logo
ITAC Assessment: LE0596
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product manufactures Steel, Chrome Iron and High Alloy casting
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area 250,000
ft2
Annual Production 1,606
ton
Production Hrs. Annual 4,576
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $726,963 8,552,100
kWh
Electricity Demand $126,567 49,845
kW-mo/yr
Electricity Fees $62,076 -
Natural Gas $160,074 36,719
MMBtu
LPG $64,287 3,321
MMBtu
TOTAL YEARLY COSTS $1,139,967
RECOMMENDED SAVINGS* $240,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.7261: Install timers and/or thermostats $7,008 $2,000 $7,008
82,451
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,874 $2,600 $4,633
54,519
kWh
$241
-
kW-mo/yr
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $26,110 $14,500 - - - $26,110
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $10,210 $8,000 $9,619
113,174
kWh
$591
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,423 $5,658 $6,015
70,761
kWh
$408
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $702 $660 $702
8,255
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,044 $45,000 $22,850
268,829
kWh
$1,194
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,365 $24,074 $10,683
125,686
kWh
$682
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,935 $14,078 $5,579
65,636
kWh
$356
-
kW-mo/yr
- -
10 2.1336: Install equipment to utilize waste fuel $90,409 $240,000 - - $90,409
-
MMBtu
-
11 2.1331: Burn a less expensive grade of fuel $49,500 $160,000 - - $(-14,388.0)
-
MMBtu
$63,888
-
MMBtu
12 2.7234: Use heat pump for space conditioning $3,616 $14,943 $3,463
40,754
kWh
$153
-
kW-mo/yr
- -
TOTAL RECOMMENDED $240,196 $531,513 $70,552
830,065
kWh
$3,625
-
kW-mo/yr
$76,021
-
MMBtu
$89,998
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs