ITAC Assessment: GT0837
ITAC logo
ITAC Assessment: GT0837
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Jail Modules
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 343
Plant Area 127,000
ft2
Annual Production 1,250
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,742 2,867,140
kWh
Electricity Demand $90,596 5,925
kW-mo/yr
Electricity Fees $1,053 -
Natural Gas $464,736 55,034
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $4,990 - $4,990
109,400
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,300 $3,250 $18,300
401,968
kWh
- - - -
03 2.2135: Repair and eliminate steam leaks $14,528 $1,800 - - $13,961
-
MMBtu
$567
-
Tgal
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $47,920 - - - $47,920
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $13,963 - - - - - $13,963
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,571 $7,090 $1,764
38,660
kWh
$807
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $30,118 $41,616 $21,586
472,968
kWh
$8,532
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $132,390 $53,756 $46,640
1,022,996
kWh
$9,339
-
kW-mo/yr
$61,881
-
MMBtu
$567
-
Tgal
$13,963
TOTAL IMPLEMENTED $102,272 $12,140 $25,054
550,028
kWh
$807
-
kW-mo/yr
$61,881
-
MMBtu
$567
-
Tgal
$13,963
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs