Assessment Year | 2012 |
---|---|
Principal Product | Light Truck and Utility Vehicle |
NAICS | 336112: Light Truck and Utility Vehicle Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
120,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,728 | 1,726,986 |
kWh
|
$0.085 |
Electricity Demand | $34,467 | 7,048 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $10,604 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,455 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,556 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4111: Use closed cycle process to minimize waste water production | $23,380 | $25,234 | - | - | $23,380 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,340 | $39,360 |
$12,016
141,373
kWh
|
$3,324
-
kW-mo/yr
|
- | |
03 | 2.7145: Install skylights | $7,706 | $13,800 |
$6,066
69,728
kWh
|
$1,640
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,310 | $1,660 |
$2,557
30,082
kWh
|
$3,753
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $5,132 | $1,400 |
$3,303
38,858
kWh
|
$1,829
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $4,409 | $80 |
$3,455
40,651
kWh
|
$954
-
kW-mo/yr
|
- | |
07 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $3,519 | $11,300 |
$2,267
26,672
kWh
|
$1,252
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,579 | $1,660 |
$1,224
14,405
kWh
|
$355
-
kW-mo/yr
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,502 | $80 |
$1,195
14,053
kWh
|
$307
-
kW-mo/yr
|
- | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $922 | $80 |
$707
8,323
kWh
|
$215
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $656 | $3,010 |
$514
6,055
kWh
|
$142
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $70,455 | $97,664 |
$33,304
390,200
kWh
|
$13,771
-
kW-mo/yr
|
$23,380 | ||
TOTAL IMPLEMENTED | $43,556 | $61,130 |
$31,037
363,528
kWh
|
$12,519
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs