ITAC Assessment: MI0226
ITAC logo
ITAC Assessment: MI0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Light Truck and Utility Vehicle
NAICS 336112: Light Truck and Utility Vehicle Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 120,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,496
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,728 1,726,986
kWh
Electricity Demand $34,467 7,048
kW-mo/yr
Electricity Fees $10,604 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 3.4111: Use closed cycle process to minimize waste water production $23,380 $25,234 - - $23,380
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,340 $39,360 $12,016
141,373
kWh
$3,324
-
kW-mo/yr
-
03 2.7145: Install skylights $7,706 $13,800 $6,066
69,728
kWh
$1,640
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,310 $1,660 $2,557
30,082
kWh
$3,753
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $5,132 $1,400 $3,303
38,858
kWh
$1,829
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $4,409 $80 $3,455
40,651
kWh
$954
-
kW-mo/yr
-
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $3,519 $11,300 $2,267
26,672
kWh
$1,252
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,579 $1,660 $1,224
14,405
kWh
$355
-
kW-mo/yr
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,502 $80 $1,195
14,053
kWh
$307
-
kW-mo/yr
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $922 $80 $707
8,323
kWh
$215
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $656 $3,010 $514
6,055
kWh
$142
-
kW-mo/yr
-
TOTAL RECOMMENDED $70,455 $97,664 $33,304
390,200
kWh
$13,771
-
kW-mo/yr
$23,380
TOTAL IMPLEMENTED $43,556 $61,130 $31,037
363,528
kWh
$12,519
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs