ITAC Assessment: UF0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product soy milk
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 101
Plant Area 185,000
ft2
Annual Production 17,200,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $576,888 8,022,466
kWh
Natural Gas $502,803 52,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $207 $79 $207
3,564
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,683 $42,414 $24,683
365,602
kWh
-
03 2.4224: Upgrade controls on compressors $12,505 $731 $12,505
215,612
kWh
-
04 2.1113: Reduce combustion air flow to optimum $1,855 $795 - $1,855
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $17,781 $615 - $17,781
-
MMBtu
06 2.4151: Develop a repair/replace policy $2,521 - $2,521
34,521
kWh
-
07 2.7245: Use direct air supply to exhaust hoods $2,081 $534 $2,081
38,812
kWh
-
08 2.6232: Install set-back timers $15,103 $4,916 $15,103
262,543
kWh
-
09 2.7225: Close outdoor air dampers during warm-up / cool-down periods $1,822 $10,480 $1,822
31,410
kWh
-
10 2.2441: Preheat boiler makeup water with waste process heat $95,676 $20,000 - $95,676
-
MMBtu
11 2.1131: Repair faulty insulation in furnaces, boilers, etc $9,359 $4,246 - $9,359
-
MMBtu
TOTAL RECOMMENDED $183,593 $84,810 $58,922
952,064
kWh
$124,671
-
MMBtu
TOTAL IMPLEMENTED $83,774 $63,402 $56,634
909,688
kWh
$27,140
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs