| Assessment Year | 2004 |
|---|---|
| Principal Product | Fluid Milk |
| NAICS | 311511: Fluid Milk Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $50 M to 100M |
| # of Employees | 64 |
| Plant Area |
40,000
ft2
|
| Annual Production | 21,000
Tgal
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $331,760 | 4,025,121 |
kWh
|
$0.082 |
| Electricity Demand | $120,958 | 8,080 |
kW-mo/yr
|
$14.97 |
| Natural Gas | $135,853 | 17,596 |
MMBtu
|
$7.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,564 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,712 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $16,106 | - | - | - | - | - | - | $16,106 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,301 | - |
$3,403
41,500
kWh
|
$898
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,966 | - |
$1,517
18,495
kWh
|
$449
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $4,301 | $154 |
$3,403
41,500
kWh
|
$898
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.1222: Install turbulators | $3,875 | $350 | - | - | - |
$3,875
-
MMBtu
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,462 | $725 |
$2,743
33,449
kWh
|
$719
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.4314: Use synthetic lubricant | $2,982 | $1,000 |
$2,263
26,628
kWh
|
$719
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.1331: Burn a less expensive grade of fuel | $26,570 | $16,638 | - | - | - |
$135,841
-
MMBtu
|
$(-109,271.0)
-
MMBtu
|
- | |
| 09 | 2.3212: Optimize plant power factor | $2,001 | $6,941 | - | - | $2,001 | - | - | - | |
| TOTAL RECOMMENDED | $65,564 | $25,808 |
$13,329
161,572
kWh
|
$3,683
-
kW-mo/yr
|
$2,001 |
$139,716
-
MMBtu
|
$(-109,271.0)
-
MMBtu
|
$16,106 | ||
| TOTAL IMPLEMENTED | $14,712 | $8,820 |
$9,926
120,072
kWh
|
$2,785
-
kW-mo/yr
|
$2,001 | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs