| Assessment Year | 2006 |
|---|---|
| Principal Product | Plastic bottles |
| NAICS | 326160: Plastics Bottle Manufacturing |
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 54 |
| Plant Area |
145,000
ft2
|
| Annual Production | 400,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $960,261 | 25,560,122 |
kWh
|
$0.038 |
| Electricity Demand | $583,212 | 42,293 |
kW-mo/yr
|
$13.79 |
| Electricity Fees | $1,671 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $74,124 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $17,610 | $9,470 |
$17,610
306,866
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,500 | $50 |
$6,040
186,200
kWh
|
$3,460
-
kW-mo/yr
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $1,244 | $493 |
$785
24,193
kWh
|
$459
-
kW-mo/yr
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $200 | $510 |
$130
3,900
kWh
|
$70
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,290 | $57,670 |
$26,970
831,100
kWh
|
$13,330
-
kW-mo/yr
|
$620 | $1,370 | |
| 06 | 2.2711: Utilize outside air instead of conditioned air for drying | $1,680 | $1,310 |
$1,070
33,000
kWh
|
$610
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,600 | $2,970 |
$520
16,000
kWh
|
$390
-
kW-mo/yr
|
- | $690 | |
| 08 | 2.9114: Use solar heat to make electricty | $1,300 | $2,950 |
$460
14,100
kWh
|
$840
-
kW-mo/yr
|
- | - | |
| 09 | 2.7135: Install occupancy sensors | $130 | $390 |
$120
3,600
kWh
|
$10
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $75,554 | $75,813 |
$53,705
1,418,959
kWh
|
$19,169
-
kW-mo/yr
|
$620 | $2,060 | ||
| TOTAL IMPLEMENTED | $74,124 | $72,473 |
$53,125
1,401,259
kWh
|
$18,319
-
kW-mo/yr
|
$620 | $2,060 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs