Assessment Year | 2007 |
---|---|
Principal Product | aircrafts parts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $100 M to 500M |
# of Employees | 1,372 |
Plant Area |
500,000
ft2
|
Annual Production | 1,300,000
pieces
|
Production Hrs. Annual | 6,188
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $569,338 | 10,191,299 |
kWh
|
$0.056 |
Electricity Demand | $133,568 | 23,887 |
kW-mo/yr
|
$5.59 |
Natural Gas | $267,331 | 19,083 |
MMBtu
|
$14.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $215,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,281 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2442: Preheat combustion air with waste heat | $29,529 | $1,827 | - | - |
$29,529
-
MMBtu
|
- | |
02 | 2.2515: Use optimum thickness insulation | $640 | $2,320 | - | - |
$640
-
MMBtu
|
- | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $335 | $177 |
$335
5,985
kWh
|
- | - | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,214 | - |
$1,570
28,032
kWh
|
$644
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $64,361 | $80,399 |
$62,865
924,624
kWh
|
$1,496
-
kW-mo/yr
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $13,315 | $57,868 |
$13,315
237,773
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $3,641 | $194 |
$3,641
65,011
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,006 | $1,413 |
$29,006
414,377
kWh
|
- | - | - | |
09 | 2.6231: Utilize controls to operate equipment only when needed | $38,931 | $2,136 |
$38,931
695,190
kWh
|
- | - | - | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,194 | $390 |
$2,194
39,174
kWh
|
- | - | - | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,118 | $1,373 |
$4,118
73,528
kWh
|
- | - | - | |
12 | 2.7292: Lower ceiling to reduce conditioned space | $2,259 | $8,400 |
$1,628
29,084
kWh
|
$631
-
kW-mo/yr
|
- | - | |
13 | 4.821: Pay bills on time to avoid late fees | $24,897 | - | - | - | - | $24,897 | |
TOTAL RECOMMENDED | $215,440 | $156,497 |
$157,603
2,512,778
kWh
|
$2,771
-
kW-mo/yr
|
$30,169
-
MMBtu
|
$24,897 | ||
TOTAL IMPLEMENTED | $33,281 | $761 |
$7,740
138,202
kWh
|
$644
-
kW-mo/yr
|
- | $24,897 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs