ITAC Assessment: UF0402
ITAC logo
ITAC Assessment: UF0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product aircrafts parts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $100
M
to 500
M
# of Employees 1,372
Plant Area 500,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 6,188
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,338 10,191,299
kWh
Electricity Demand $133,568 23,887
kW-mo/yr
Natural Gas $267,331 19,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $215,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2442: Preheat combustion air with waste heat $29,529 $1,827 - - $29,529
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $640 $2,320 - - $640
-
MMBtu
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $335 $177 $335
5,985
kWh
- - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,214 - $1,570
28,032
kWh
$644
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $64,361 $80,399 $62,865
924,624
kWh
$1,496
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $13,315 $57,868 $13,315
237,773
kWh
- - -
07 2.7135: Install occupancy sensors $3,641 $194 $3,641
65,011
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,006 $1,413 $29,006
414,377
kWh
- - -
09 2.6231: Utilize controls to operate equipment only when needed $38,931 $2,136 $38,931
695,190
kWh
- - -
10 2.7447: Install vinyl strip / high speed / air curtain doors $2,194 $390 $2,194
39,174
kWh
- - -
11 2.7447: Install vinyl strip / high speed / air curtain doors $4,118 $1,373 $4,118
73,528
kWh
- - -
12 2.7292: Lower ceiling to reduce conditioned space $2,259 $8,400 $1,628
29,084
kWh
$631
-
kW-mo/yr
- -
13 4.821: Pay bills on time to avoid late fees $24,897 - - - - $24,897
TOTAL RECOMMENDED $215,440 $156,497 $157,603
2,512,778
kWh
$2,771
-
kW-mo/yr
$30,169
-
MMBtu
$24,897
TOTAL IMPLEMENTED $33,281 $761 $7,740
138,202
kWh
$644
-
kW-mo/yr
- $24,897
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs