Assessment Year | 2004 |
---|---|
Principal Product | Military Aircrafts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
259,200
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $230,191 | 4,985,520 |
kWh
|
$0.046 |
Electricity Demand | $59,226 | 9,420 |
kW-mo/yr
|
$6.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $121,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,506 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,587 | $63,488 |
$27,714
815,120
kWh
|
$20,872
-
kW-mo/yr
|
- | |
02 | 2.7124: Make a practice of turning off lights when not needed | $19,414 | - |
$2,425
71,313
kWh
|
$16,990
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $18,795 | $62,620 |
$13,172
387,400
kWh
|
$5,623
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,169 | $745 |
$11,169
242,810
kWh
|
- | - | |
05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $7,962 | $31,000 |
$5,580
164,112
kWh
|
$2,382
-
kW-mo/yr
|
- | |
06 | 2.7141: Lower light fixtures in high ceiling areas | $6,140 | $779 |
$2,970
87,360
kWh
|
$3,170
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $4,543 | - |
$4,543
133,628
kWh
|
- | - | |
08 | 2.7131: Add area lighting switches | $2,354 | $11,495 |
$2,354
51,164
kWh
|
- | - | |
09 | 3.5318: Recycle fluorescent lamps | $2,883 | $3,496 | - | - |
$2,883
-
lb
|
|
TOTAL RECOMMENDED | $121,847 | $173,623 |
$69,927
1,952,907
kWh
|
$49,038
-
kW-mo/yr
|
$2,883
-
lb
|
||
TOTAL IMPLEMENTED | $80,506 | $94,488 |
$40,262
1,184,173
kWh
|
$40,244
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs