ITAC Assessment: UF0354
ITAC logo
ITAC Assessment: UF0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Military Aircrafts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 259,200
ft2
Annual Production 0
pieces
Production Hrs. Annual 3,952
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,191 4,985,520
kWh
Electricity Demand $59,226 9,420
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $48,587 $63,488 $27,714
815,120
kWh
$20,872
-
kW-mo/yr
-
02 2.7124: Make a practice of turning off lights when not needed $19,414 - $2,425
71,313
kWh
$16,990
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $18,795 $62,620 $13,172
387,400
kWh
$5,623
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,169 $745 $11,169
242,810
kWh
- -
05 2.7313: Recycle air for heating, ventilation and air conditioning $7,962 $31,000 $5,580
164,112
kWh
$2,382
-
kW-mo/yr
-
06 2.7141: Lower light fixtures in high ceiling areas $6,140 $779 $2,970
87,360
kWh
$3,170
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $4,543 - $4,543
133,628
kWh
- -
08 2.7131: Add area lighting switches $2,354 $11,495 $2,354
51,164
kWh
- -
09 3.5318: Recycle fluorescent lamps $2,883 $3,496 - - $2,883
-
lb
TOTAL RECOMMENDED $121,847 $173,623 $69,927
1,952,907
kWh
$49,038
-
kW-mo/yr
$2,883
-
lb
TOTAL IMPLEMENTED $80,506 $94,488 $40,262
1,184,173
kWh
$40,244
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs