| Assessment Year | 1999 |
|---|---|
| Principal Product | Packaging |
| NAICS |
n/a
|
| SIC | 3082: Unsupported Plastics Profile Shapes |
| Sales Range | $10 M to 50M |
| # of Employees | 240 |
| Plant Area |
55,000
ft2
|
| Annual Production | 15,120,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $492,245 | 7,575,323 |
kWh
|
$0.065 |
| Electricity Demand | $111,600 | 17,885 |
kW-mo/yr
|
$6.24 |
| LPG | $46,007 | 8,009 |
MMBtu
|
$5.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,836 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2711: Utilize outside air instead of conditioned air for drying | $19,520 | $4,860 |
$19,520
300,410
kWh
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $11,434 | $2,159 | - | - |
$11,434
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,056 | $22,438 |
$10,461
160,903
kWh
|
$1,595
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $9,306 | $450 |
$9,306
143,318
kWh
|
- | - | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $9,306 | $500 |
$9,306
143,318
kWh
|
- | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $9,227 | $850 |
$9,227
142,732
kWh
|
- | - | - | |
| 07 | 4.821: Pay bills on time to avoid late fees | $5,265 | - | - | - | - | $5,265 | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,172 | $5,760 |
$4,964
76,202
kWh
|
$2,021
-
kW-mo/yr
|
$(-1,813.0)
-
MMBtu
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $2,760 | $7,122 |
$2,438
37,515
kWh
|
$322
-
kW-mo/yr
|
- | - | |
| 10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,141 | $7,579 |
$1,909
26,377
kWh
|
$823
-
kW-mo/yr
|
$(-591.0)
-
MMBtu
|
- | |
| 11 | 2.2511: Insulate bare equipment | $1,899 | $1,260 | - | - |
$1,899
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $88,086 | $52,978 |
$67,131
1,030,775
kWh
|
$4,761
-
kW-mo/yr
|
$10,929
-
MMBtu
|
$5,265 | ||
| TOTAL IMPLEMENTED | $35,836 | $16,751 |
$16,708
257,035
kWh
|
$2,343
-
kW-mo/yr
|
$11,520
-
MMBtu
|
$5,265 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs