ITAC Assessment: UA0082
ITAC logo
ITAC Assessment: UA0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Car Body Stampings
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 425
Plant Area 382,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 7,848
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $764,754 14,253,740
kWh
Electricity Demand $153,886 37,851
kW-mo/yr
Natural Gas $6,157 478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $89,005 - $83,948
1,564,740
kWh
- $5,057 -
02 2.7241: Install outside air damper / economizer on hvac unit $25,747 $24,000 $23,753
442,740
kWh
$537
-
kW-mo/yr
$1,457 -
03 2.7442: Keep doors and windows shut when not on use $21,616 $1,199 $20,392
380,100
kWh
- $1,224 -
04 2.7261: Install timers and/or thermostats $2,439 - $2,301
42,881
kWh
- $138 -
05 3.4111: Use closed cycle process to minimize waste water production $1,097 $171 - - - $1,097
-
Tgal
06 2.4322: Use or replace with energy efficient substitutes $17,850 $26,100 $14,994
279,479
kWh
$1,846
-
kW-mo/yr
$1,010 -
07 2.4224: Upgrade controls on compressors $19,536 $6,566 $17,165
319,950
kWh
$1,265
-
kW-mo/yr
$1,106 -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,883 $7,495 $10,927
203,640
kWh
$283
-
kW-mo/yr
$673 -
09 2.3212: Optimize plant power factor $18,443 $21,400 - $17,399
-
kW-mo/yr
$1,044 -
10 2.7135: Install occupancy sensors $2,406 $116 $2,270
42,302
kWh
- $136 -
TOTAL RECOMMENDED $210,022 $87,047 $175,750
3,275,832
kWh
$21,330
-
kW-mo/yr
$11,845 $1,097
-
Tgal
TOTAL IMPLEMENTED $11,883 $7,495 $10,927
203,640
kWh
$283
-
kW-mo/yr
$673 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs