ITAC Assessment: TT0280
ITAC logo
ITAC Assessment: TT0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 82,000
ft2
Annual Production 129,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $710,359 13,391,927
kWh
Electricity Demand $330,173 30,424
kW-mo/yr
Natural Gas $218,626 25,017
MMBtu
LPG $18,369 492
MMBtu
Waste Disposal Costs
Water Usage $36,703 10,166
Tgal
Water Disposal $37,734 10,166
Tgal
TOTAL YEARLY COSTS $1,351,964
RECOMMENDED SAVINGS* $170,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $52,932 $4,800 - - - - $52,932
02 2.4237: Substitute compressed air cooling with water or air cooling $29,003 $9,880 $29,003
547,224
kWh
- - - -
03 2.6231: Utilize controls to operate equipment only when needed $26,518 $6,720 $3,209
60,565
kWh
- $19,138
-
MMBtu
- $4,171
04 2.6218: Turn off equipment when not in use $21,150 - $21,150
399,064
kWh
- - - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $19,766 - $(-1,577.0)
(-29,376)
kWh
- - $18,368
-
MMBtu
$2,975
06 2.7261: Install timers and/or thermostats $14,562 $650 $9,773
184,396
kWh
- $4,789
-
MMBtu
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,878 $5,100 $2,162
40,788
kWh
$716
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,072 $3,400 $1,488
28,081
kWh
$584
-
kW-mo/yr
- - -
09 2.6212: Turn off equipment during breaks, reduce operating time $1,550 - $1,550
29,250
kWh
- - - -
10 2.4151: Develop a repair/replace policy $298 $1,247 $211
3,978
kWh
$87
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $170,729 $31,797 $66,969
1,263,970
kWh
$1,387
-
kW-mo/yr
$23,927
-
MMBtu
$18,368
-
MMBtu
$60,078
TOTAL IMPLEMENTED $122,851 $14,680 $48,576
916,912
kWh
- - $18,368
-
MMBtu
$55,907
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs