| Assessment Year | 1986 |
|---|---|
| Principal Product | LIQUEFIED GASES |
| NAICS |
n/a
|
| SIC | 2813: Industrial Gases |
| Sales Range | $10 M to 50M |
| # of Employees | 45 |
| Plant Area |
n/a
|
| Annual Production | 164,250
ton
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $4,385,140 | 124,878,665 |
kWh
|
$0.035 |
| Fuel Oil #2 | $75,785 | 11,788 |
MMBtu
|
$6.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $108,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,579 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,364 | $537 | - |
$1,364
-
MMBtu
|
|
| 02 | 2.7261: Install timers and/or thermostats | $9,159 | $1,000 |
$9,159
260,844
kWh
|
- | |
| 03 | 2.6121: Reduce hot water temperature to the minimum required | $108 | - |
$108
3,224
kWh
|
- | |
| 04 | 2.2135: Repair and eliminate steam leaks | $5,948 | $500 | - |
$5,948
-
MMBtu
|
|
| 05 | 2.4311: Recover mechanical energy | $91,733 | $135,000 |
$91,733
2,613,716
kWh
|
- | |
| TOTAL RECOMMENDED | $108,312 | $137,037 |
$101,000
2,877,784
kWh
|
$7,312
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,579 | $2,037 |
$9,267
264,068
kWh
|
$7,312
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs