Assessment Year | 2016 |
---|---|
Principal Product | Steel Tubes |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $50 M to 100M |
# of Employees | 247 |
Plant Area |
450,000
ft2
|
Annual Production | 74,000,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,019 | 8,692,800 |
kWh
|
$0.039 |
Electricity Demand | $262,633 | 23,201 |
kW-mo/yr
|
$11.32 |
Natural Gas | $61,045 | 8,659 |
MMBtu
|
$7.05 |
TOTAL YEARLY COSTS | $662,697 | |||
RECOMMENDED SAVINGS* | $118,468 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $115,767 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4235: Remove or close off unneeded compressed air lines | $27,451 | $700 |
$27,451
703,872
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $27,289 | - |
$27,289
699,729
kWh
|
- | - | - | |
03 | 2.4224: Upgrade controls on compressors | $25,771 | $40,000 |
$21,680
555,897
kWh
|
$4,091
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,587 | $100,037 |
$17,071
437,728
kWh
|
$2,069
-
kW-mo/yr
|
- | $3,447 | |
05 | 2.4225: Install common header on compressors | $8,381 | $11,700 |
$8,381
214,680
kWh
|
- | - | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $2,293 | $10,800 |
$2,293
58,792
kWh
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,241 | $2,500 |
$1,420
36,410
kWh
|
$821
-
kW-mo/yr
|
- | - | |
08 | 2.7261: Install timers and/or thermostats | $2,047 | $1,575 |
$785
20,130
kWh
|
- |
$1,262
-
MMBtu
|
- | |
09 | 2.4151: Develop a repair/replace policy | $408 | $661 |
$200
5,135
kWh
|
$208
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $118,468 | $167,973 |
$106,570
2,732,373
kWh
|
$7,189
-
kW-mo/yr
|
$1,262
-
MMBtu
|
$3,447 | ||
TOTAL IMPLEMENTED | $115,767 | $156,512 |
$104,077
2,668,446
kWh
|
$6,981
-
kW-mo/yr
|
$1,262
-
MMBtu
|
$3,447 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs